MMS Medical were contracted by Tom O’Brien Construction company to supply and install a Barduva SB200 platform lift in an office building renovation on O’Connell Street in Waterford in 2018. The offices were extensively refurbished by the building contractors and to ensure the building was accessible for both workers and visitors a platform lift was installed to improve accessibility for the building.

Jim carried out a full site survey and discussed the platform lift options and specification with the on-site team. When selecting the correct platform lift for your project, we consider footprint, space, door type, lifting capability and pit room and our team of lift specialists are on hand to guide you through each phase of your project. Following agreement the Barduva SB200 was ordered and details were specified for ensuring timely installation. The flexible design of the Barduva SB200 combined with low space requirements, high level of security, power saving technologies and smart digital control system ensured the lift was the ideal choice for this refurbishment.

 

Tom O’Brien Construction contacted MMS Medical to supply and fit a platform lift to a fit-out project we carried out in O’Connell Street, Waterford. MMS arrived on site the day they said they would, installed their lift and commissioned their lift all within the agreed time period. We would not hesitate to recommend MMS Medical or draw on their services again in the future. We were very satisfied with the quality of their work and their professionalism “

 

Thomas O'Brien, O'Brien Construction